Resource Type

Journal Article 126

Year

2024 1

2023 6

2022 5

2021 5

2019 6

2018 4

2017 3

2016 10

2015 1

2014 5

2013 3

2012 7

2011 22

2010 10

2009 3

2008 5

2007 7

2006 3

2005 3

2004 5

open ︾

Keywords

arch dam 6

dam 6

concrete dam 3

concrete face rockfill dam 3

earthquake 3

Dam 2

Dam safety 2

cracking 2

different 2

finite element method 2

3D model 1

AHP method 1

ANFIS 1

ANSYS 1

AURTI 1

Adenovirus 1

Air entrainment 1

Arch dam overall safety 1

Balaroud Dam 1

open ︾

Search scope:

排序: Display mode:

Seepage analysis of Upper Gotvand Dam concerning gypsum karstification (2D and 3D approaches)

Jamshid SADREKARIMI, Majid KIYANI, Behnam FAKHRI, Mohammad Javad VAHDATIRAD, Amin BARARI

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 71-78 doi: 10.1007/s11709-010-0083-5

Abstract: Upper Gotvand Dam is constructed on the Karun River at the south west of Iran.In this paper, 2D and 3D models of the dam together with the foundation and abutments were established

Keywords: Upper Gotvand Dam     seepage analysis     gypsum veins     3D model     discharge flux    

Approaching the upper boundary of driver-response relationships: identifying factors using a novel framework

Frontiers of Environmental Science & Engineering 2023, Volume 17, Issue 6, doi: 10.1007/s11783-023-1676-2

Abstract:

● A novel framework integrating quantile regression with machine learning is proposed.

Keywords: Driver-response     Upper boundary of relationship     Interpretable machine learning     Quantile regression    

Optimum design and preliminary experiments of a novel parallel end traction apparatus for upper-limb

Frontiers of Mechanical Engineering 2021, Volume 16, Issue 4,   Pages 726-746 doi: 10.1007/s11465-021-0651-5

Abstract: Robot-assisted technology has been increasingly employed in the therapy of post stroke patients to deliver high-quality treatment and alleviate therapists’ burden. This paper introduces a novel parallel end traction apparatus (PETA) to supplement equipment selection. Considering the appearance and performance of the PETA, two types of special five-bar linkage mechanisms are selected as the potential configurations of the actuation execution unit because of their compact arrangement and parallel structure. Kinematic analysis of each mechanism, i.e., position solutions and Jacobian matrix, is carried out. Subsequently, a comparative study between the two mechanisms is conducted. In the established source of nondimensional parameter synthesis, the singularity, maximum continuous workspace, and performance variation trends are analyzed. Based on the evaluation results, the final scheme with determined configuration and corresponding near-optimized nondimensional parameters is obtained. Then, a prototype is constructed. By adding a lockable translational degree of freedom in the vertical direction, the PETA can provide 2D planar exercise and 3D spatial exercise. Finally, a control system is developed for passive exercise mode based on the derived inverse position solution, and preliminary experiments are performed to verify the applicability of the PETA.

Keywords: parallel mechanism     upper-limb rehabilitation     singularity and workspace analyses     performance evaluation    

Regeneration of vernacular architecture: new rammed earth houses on the upper reaches of the Yangtze

Jiaping LIU, Rongrong HU, Liu YANG, Runshan WANG,

Frontiers in Energy 2010, Volume 4, Issue 1,   Pages 93-99 doi: 10.1007/s11708-010-0002-4

Abstract: briefly describes a project about creating a new prototype of earth house for the migrants along the upper

Keywords: earth house     low-energy housing     upper reaches of the Yangtze River     passive solar technique    

Design and preliminary evaluation of an exoskeleton for upper limb resistance training

Tzong-Ming WU, Dar-Zen CHEN

Frontiers of Mechanical Engineering 2012, Volume 7, Issue 2,   Pages 188-198 doi: 10.1007/s11465-012-0327-2

Abstract: A compact design of upper limb exoskeleton mechanism for home-based resistance training using a spring-loadedupper limb exoskeleton with a three degree-of-freedom shoulder joint and a one degree-of-freedom elbowjoint allows a patient or a healthy individual to move the upper limb with multiple joints in differentthe spring length to train additional muscle groups and reduce the number of potential injuries to upperverify our prototype of the exoskeleton and determine the optimal configuration of the spring-loaded upper

Keywords: exoskeleton     free-weight exercise     upper limb     motion analysis    

EEG controlled neuromuscular electrical stimulation of the upper limb for stroke patients

Hock Guan TAN, Cheng Yap SHEE, Keng He KONG, Cuntai GUAN, Wei Tech ANG

Frontiers of Mechanical Engineering 2011, Volume 6, Issue 1,   Pages 71-81 doi: 10.1007/s11465-011-0207-1

Abstract: without the loss of generality, the controller of the NMES is developed and is based on a model of the upper

Keywords: brain computer interface     neuromuscular electrical stimulation     stroke     musculoskeletal modeling    

CFD Simulation of thermal hydraulic characteristics in a typical upper plenum of RPV

Mingjun WANG, Lianfa WANG, Yingjie WANG, Wenxi TIAN, Jian DENG, Guanghui SU, Suizheng QIU

Frontiers in Energy 2021, Volume 15, Issue 4,   Pages 930-945 doi: 10.1007/s11708-021-0728-1

Abstract: dynamics (CFD) study was conducted on the three different types of pressurized water reactor (PWR) upperFirst, three types of upper plenum geometry information were collected, simplified, and adopted intoThen, the geometry, including the upper half core, upper plenum region, and hot legs, was built usingcore outlet and temperature distribution and transverse velocity inside the hot legs with different upperThe results suggest that TYPE 1 upper plenum internals cause the largest flowrate difference at the core

Keywords: pressurized water reactor (PWR)     upper plenum     internal structures     temperature distribution     computational    

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1,   Pages 76-83 doi: 10.1007/s11709-012-0144-z

Abstract: The 130 m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part ofThe dam is founded on highly folded and partially crushed dolomite and limestone formations.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and threein the rock foundation of the right abutment outside of the dam.The paper describes the long-term safety monitoring of this 42 years old arch dam.

Keywords: dam safety concept     arch dam     dam instrumentation     dam safety monitoring    

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Strategic Study of CAE 2000, Volume 2, Issue 12,   Pages 84-89

Abstract: The scientific and technological achievements and their application in geologic exploration, dam construction, flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slopeThey in elude the 181 m-high concrete gravity dam in the Three Gorges Project, the 240 m — highCFRD, the 233 m~high Shuibuya CFRD, the 130 m- high Shapai RCC arch dam, the 131 m- high Jiangya RCCgravity dam, etc.

Keywords: hydroelectric power     high dam     gravity dam     arch dam     roller compacted concrete dam (RC-CD)     concrete facerockfill dam (CFRD)    

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 56-64 doi: 10.1007/s11709-010-0005-6

Abstract: Earthquakes can affect large dam projects in many different ways.Among these dams were the 132-m-high Shapai RCC arch dam and the 156-m-high Zipingpu concrete face rockfilldam.These recently completed dams are dam types which, up to now, have not experienced strong ground shaking

Keywords: seismic hazard     arch dam     concrete face rockfill dam     strong motion instrumentation     reservoir-triggered    

Upper bound solution to seismic active earth pressure of submerged backfill subjected to partial drainage

Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 6,   Pages 1480-1493 doi: 10.1007/s11709-021-0776-y

Abstract: The method comprises the following steps: i) determination of the total head, ii) upper bound solutionexpansions, and the expressions of the seismic active earth thrust and pressure are derived by using the upper

Keywords: seismic active earth pressure     partial seepage flow     pore pressure     anisotropy     upper bound theorem    

Expression status of GATA3 and mismatch repair proteins in upper tract urothelial carcinoma

Yue Wang, Jinxia Zhang, Yunfan Wang, Shufang Wang, Yu Zhang, Qi Miao, Fei Gao, Huiying He

Frontiers of Medicine 2019, Volume 13, Issue 6,   Pages 730-740 doi: 10.1007/s11684-019-0687-7

Abstract: However, the combined expression of GATA3 and microsatellite instability (MSI) in upper tract urothelial

Keywords: upper tract urothelial carcinoma     GATA binding protein 3     mismatch repair     microsatellite instability     prognosis    

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 98-104 doi: 10.1007/s11709-010-0004-7

Abstract: The dam heightening, which is an effective way to increase reservoir volume, has been paid close attentionThree problems should be dealt with when an arch dam needs to be heightened: stress state getting worseat dam heel, cracking on new added concrete dam surface, and weak bonding between new added concreteand old dam.The tensile stresses on dam’s surface and joint face that have certain relations to the dam heightening

Keywords: arch dam     heighten     tensile stress     finite element method    

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 63-70 doi: 10.1007/s11709-010-0016-3

Abstract: relevant material parameters for a valuation of the deformation behavior of the up- and downstream damshell by means of an embankment dam of medium height.This gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.Several times higher dam settlements as well as significant differential settlements between the up-and downstream dam shell were observed during construction and operation.

Keywords: embankment dam     bituminous concrete membrane     rock-fill material properties     deformation behavior    

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 92-101 doi: 10.1007/s11709-010-0009-2

Abstract: In this paper we analyzed a real fill-type dam, named the Minami-Aiki Dam, to verify a numerical consolidation

Keywords: fill dam     consolidation analysis     unsaturated geo-materials     impounding     construction    

Title Author Date Type Operation

Seepage analysis of Upper Gotvand Dam concerning gypsum karstification (2D and 3D approaches)

Jamshid SADREKARIMI, Majid KIYANI, Behnam FAKHRI, Mohammad Javad VAHDATIRAD, Amin BARARI

Journal Article

Approaching the upper boundary of driver-response relationships: identifying factors using a novel framework

Journal Article

Optimum design and preliminary experiments of a novel parallel end traction apparatus for upper-limb

Journal Article

Regeneration of vernacular architecture: new rammed earth houses on the upper reaches of the Yangtze

Jiaping LIU, Rongrong HU, Liu YANG, Runshan WANG,

Journal Article

Design and preliminary evaluation of an exoskeleton for upper limb resistance training

Tzong-Ming WU, Dar-Zen CHEN

Journal Article

EEG controlled neuromuscular electrical stimulation of the upper limb for stroke patients

Hock Guan TAN, Cheng Yap SHEE, Keng He KONG, Cuntai GUAN, Wei Tech ANG

Journal Article

CFD Simulation of thermal hydraulic characteristics in a typical upper plenum of RPV

Mingjun WANG, Lianfa WANG, Yingjie WANG, Wenxi TIAN, Jian DENG, Guanghui SU, Suizheng QIU

Journal Article

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Journal Article

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Journal Article

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Journal Article

Upper bound solution to seismic active earth pressure of submerged backfill subjected to partial drainage

Journal Article

Expression status of GATA3 and mismatch repair proteins in upper tract urothelial carcinoma

Yue Wang, Jinxia Zhang, Yunfan Wang, Shufang Wang, Yu Zhang, Qi Miao, Fei Gao, Huiying He

Journal Article

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Journal Article

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Journal Article

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Journal Article